Jagruti Conveyor Belts Pvt. Ltd.
Home Project CC8B, Belt Replacement (EBS)

CC8B, Belt Replacement (EBS)

Project Location:

ESSSAR VADINAR POWER, Gujarat.

Scope of work:

2 Km Steel Cord belt replacement under emergency breakdown

Time Duration:

15 Days

Description:

1) Under emergency breakdown situation we replaced two km steel cord belt by slitting a spare belt of width 1600mm into 1000mm belt and joining it by vulcanizing method.

2) We applied successful mismatch strength joint of ST2000 to ST 1000.

3) We were able to make the system operational by temporary making the steel cord belt ready to work saving significant downtime and money.

On site safety statistics:

Zero accidents